Project Details
AEP plans to construct a 138-kV transmission line that will connect the South Caldwell Substation to the Macksburg Substation in Southeastern Ohio. The transmission line will be approximately 8 miles long through Noble and Washington Counties. Construction is expected to begin in late 2017.
Case Results
State: Wisconsin (Columbia County)
Case Type: Powerline takings
Initial Offer: $12,500
Sever Walker Padgitt Result:
$28,500
State: Illinois (Pike County)
Case Type: Powerline takings
Initial Offer: $185,093
Sever Walker Padgitt Result:
$215,916
State: Illinois (Pike County)
Case Type: Powerline takings
Initial Offer: $40,640
Sever Walker Padgitt Result:
$103,055
State: Illinois (Pike County)
Case Type: Powerline takings
Initial Offer: $55,000
Sever Walker Padgitt Result:
$159,798
State: Illinois (Morgan County)
Case Type: Powerline takings
Initial Offer: $119,517
Sever Walker Padgitt Result:
$159,000
State: Illinois (Christian County)
Case Type: Powerline takings
Initial Offer: $119,194
Sever Walker Padgitt Result:
$150,955