High-Speed Rail (10th Street Corridor) Project

It is our pledge that we will provide a free case review for any individual or business facing eminent domain or condemnation.

Project Overview

  • Location of Project: Illinois

  • Type of Project: Rail

  • Timeline: 2018-2025

Project Details

The 10th Street Corridor Project in Springfield, Illinois is part of a 1.6 billion dollar High-Speed Rail Improvement Project stretching over 284 miles from Chicago to St. Louis. Costing roughly $314 million dollars, the 10th Street Corridor section consists of relocating the existing rail line on 3rd Street to 10th Street. This relocation will also include rail improvements, underpasses, and an overpass.

According to the City of Springfield, the project will be completed in segments with the first segment more than likely starting at Carpenter Street. This project is still in the design phase, but if federal funding is approved construction could start as early as 2014.

10th Street Corridor Project Map

SRIP Fact Sheet

Rail Design Well Underway For 10th Street High Speed Rail In Springfield

The money is there for design work; the question is will the money be there for land acquisition and construction?

The plan to consolidate railways in Springfield and pave the way for the proposed high speed rail from Chicago to St. Louis is taking shape and design work has ramped up in recent months.

The first piece of construction could start in mid-2014 with the installation of an underpass where Carpenter Street crosses the 10th Street tracks, and the entire project could be completed by 2020 if funding comes through.

Jim Moll, project manager for Hanson Professional Services, is overseeing the consolidation designs under a contract with the City of Springfield. Moll says the project has yet to be fully funded, but engineers are already analyzing soil samples and other conditions along the 10th Street corridor. The design work is funded by an $8.65 million grant from the Illinois Department of Transportation.

While much of the design work remains to be completed, the current plan calls for Union Pacific’s Third Street rails to follow the Norfolk Southern’s 10th Street rails through most of Springfield. Currently, the two railroads split north of the Stanford Avenue overpass. New road underpasses where Ash, Laurel, Jefferson, Madison and Carpenter streets currently cross the 10th Street tracks will allow cars to instead pass beneath the pair of train tracks.

Before construction can start, however, houses and other buildings in the path of the proposed consolidation must be purchased and moved. Hanson and other planning firms are currently working to determine what land must be acquired, and landowners may start receiving invitations for meetings in the fall to learn about the land acquisition process.

Full Story here.

If you think you may be affected by the 10th Street Springfield Rail Corridor and/or are interested in a free consultation, contact our eminent domain landowner attorneys at 1-888-318-3761 or visit us on the web at www.landownerattorneys.com.

Case Results

State: Indiana (Marion County)

Case Type: Road projects

Initial Offer: $46,160

Sever Walker Padgitt Result:

$2,400,000

State: Indiana (Johnson County)

Case Type: Road projects

Initial Offer: $301,200

Sever Walker Padgitt Result:

$3,800,000

State: Indiana (Vigo County)

Case Type: Road projects

Initial Offer: $1,186,000

Sever Walker Padgitt Result:

$4,475,000

State: Indiana (Hamilton County)

Case Type: Road projects

Initial Offer: $79,200

Sever Walker Padgitt Result:

$3,000,000

State: Georgia (Union County)

Case Type: Road projects

Initial Offer: $454,250

Sever Walker Padgitt Result:

$1,500,000

State: Illinois, Sangamon County

Case Type: Road projects

Initial Offer: $125,600

Sever Walker Padgitt Result:

$1,191,950

Meet Our Team

Sever Walker Padgitt Team Photo

At Sever Walker Padgitt, we pride ourselves on the expertise and dedication of our team. Get to know the faces behind the firm and discover the depth of knowledge and commitment that drives us to achieve the best possible outcomes for you.

Contact Us

Before going alone against the State let us give you our opinion. It is our pledge that we will provide a free case review for any individual or business facing eminent domain or condemnation. Contact us now at 888-318-3761.

Max. file size: 50 MB.
While Sever Walker Padgitt takes measures to keep our website secure, the uploading of any attachments is not a secure upload. Please do not upload sensitive documents using this form.

* Disclaimer: Form submission doesn’t constitute a client-attorney relationship/contract.