Hayes-West Fremont Transmission Line Project

It is our pledge that we will provide a free case review for any individual or business facing eminent domain or condemnation.

Project Details

The Hayes-West Freemont Project consists of an approximately 30-mile long double circuit 138 kV transmission line from the line will run from the new Hayes Substation in Erie County to the existing West Fremont Substation in Sandusky County. The new line will be built primarily on single wood poles with two guyed wood poles (steel poles may be installed at some locations) on 60-foot wide right-of-way access. The preliminary estimate for this part of the project is $19 million.

The Ohio Power Siting Board certificated this project on August 25, 2014.

Map Of Hayes-Fremont Transmission Line Project

Hayes-Fremont Transmission Line Project Map

Project Timeline

Hayes-Fremont Transmission Line Project Timeline

Opposition To Hayes-West Fremont Transmission Line

Property owners from Sandusky and Erie counties met last week at a public hearing to voice their objections to a proposed transmission line by FirstEnergy. If approved, the power line could run directly through some owners’ land, causing landowners to be concerned over not only damage to their land, but environmental hazards attributed to the electromagnetic fields from the poles.

As a result, these landowners proposed alternative routes which would move the power lines to run along property lines instead of through them, also avoiding running the line directly through Peninsular farms, which the owners argued would greatly disrupt the flow of nationally-recognized migrating birds. At the conclusion of the hearing, the administrative judge reported the next step would be an additional hearing, scheduled for June, followed by a vote from the Ohio Power Siting Board which is expected no earlier than August.

Case Results

State: Wisconsin (Columbia County)

Case Type: Powerline takings

Initial Offer: $12,500

Sever Walker Padgitt Result:

$28,500

State: Illinois (Pike County)

Case Type: Powerline takings

Initial Offer: $185,093

Sever Walker Padgitt Result:

$215,916

State: Illinois (Pike County)

Case Type: Powerline takings

Initial Offer: $40,640

Sever Walker Padgitt Result:

$103,055

State: Illinois (Pike County)

Case Type: Powerline takings

Initial Offer: $55,000

Sever Walker Padgitt Result:

$159,798

State: Illinois (Morgan County)

Case Type: Powerline takings

Initial Offer: $119,517

Sever Walker Padgitt Result:

$159,000

State: Illinois (Christian County)

Case Type: Powerline takings

Initial Offer: $119,194

Sever Walker Padgitt Result:

$150,955

Our Team

Sever Walker Padgitt Team Photo

At Sever Walker Padgitt, we pride ourselves on our team’s expertise and dedication. Get to know the faces behind the firm and discover the depth of knowledge and commitment that drives us to achieve the best possible outcomes for you.

Contact Us

Before you go up against Illinois alone, let us give you our opinion. We pledge to provide a free case review for any individual or business facing eminent domain or condemnation. Contact us now at 888-318-3761.

Max. file size: 50 MB.
While Sever Walker Padgitt takes measures to keep our website secure, the uploading of any attachments is not a secure upload. Please do not upload sensitive documents using this form.

* Disclaimer: Form submission doesn’t constitute a client-attorney relationship/contract.